When should you start building a house? Terms of construction of frame houses Fig.1. Preparation of construction production

What time is optimal for construction is a moot point. It all depends on what stage we are talking about. As for the construction of the foundation for the house, there are several opinions on this matter. Some believe that the optimal time for the construction of the foundation is autumn, others - spring. There are two sides of the coin here. So let's deal with the professionals of InnovaStroy.

When is it better to build a foundation - attention to goals and opportunities

Specialists distinguish two construction seasons: from April to December and from November to May. Needless to say, it is extremely difficult to build a structure in winter? But it is possible, especially with experienced and knowledgeable specialists. It goes without saying that starting from January, when the ground is already frozen, construction is quite problematic (special equipment is needed, additional equipment for warming up the soil, as well as protected places for storing building material). But if competent miscalculations were made and all the raw materials required for construction were purchased in advance, it is possible to carry out work all year round without delaying the deadlines and saving the customer's budget.

The most important thing is laying the foundation. What time to build the foundation? Today, design and construction work can be carried out continuously, just a certain time is suitable for each stage. There are many nuances in this regard, on the implementation of the construction of walls, ceilings and other types of work.

What is the best time of the year to build a foundation? So, two options are acceptable:

  • The foundation is laid in April-May, the walls are completed until October, and the erection of walls, roofs, and finishing is carried out until December. Here is guaranteed uninterrupted manufacturing process, by winter the whole structure is already with a roof, that is, it is completely protected from precipitation. It is essential here - if a basement is planned, then it is worth waiting out the spring flood and starting the construction of the foundation at the end of spring.
  • The foundation is laid before severe frosts, in the fall (in November, the optimum temperature for this), the walls are finally erected by March of the next year, then there is a break until May and finishing continues. This option also has its advantages. By the beginning of active construction work, the foundation had already given a good shrinkage, and this is a guarantee of the reliability of the house and simplification of finishing work. masonry in given period much stronger, because in the summer the solution dries quickly and does not have time to gain the necessary viscosity and strength. The only drawback is the duration of the work and the need for breaks between some stages.

And if for some reason the process of laying the foundation in the autumn-winter period is delayed, then it is advisable to complete it no later than mid-January, when the ground finally freezes strongly. At a time like thisfoundation building will cost the additional effort of the workers:

  • warming up frozen ground for digging a pit;
  • special training;
  • laying and subsequent care of concrete, that is, maintaining the optimum temperature until the required strength characteristics are obtained.

To date, there is a special concrete with anti-frost additives on sale, but it can also be used at -5, -6 degrees. But what if the concrete was poured, and frost suddenly struck, as sometimes happens in our area? The setting process will stop, which entails a subsequent loss of strength of the base in the future.

What if we build the foundation in the fall and the house in the winter?

  • Usually good specialists are always in great demand. In the “main” construction season (from spring), the “boom” begins: everyone has calculated their budget, summed up their capabilities and tuned in to start construction work with renewed vigor. Accordingly, the prices are "hit" for materials, services, etc. The autumn-winter period becomes the most profitable for construction - pleasant discounts will please everyone who decides to start in the fall.
  • At your disposal are the best specialists, construction teams, to which it would be difficult to break through at any other time. Basically, many, adhering to stereotypes, are waiting for the bright sun to turn to builders and designers. For them, the picture is acceptable: sunshine, an earthen plot and workers impatiently waiting for the appearance of at least a small cloud.
  • There are no problems with transporting the material in winter (when the access roads are well frozen, but the foundation has already been erected) - usually in summer and spring the roads are subject to soaking (although everything, of course, depends on the weather conditions), the customer has to pay additionally these costs.

Today, it is not worth relying completely on the weather - sometimes it can rain in winter, and the winter day is short and the builders have little time - the productivity of work is lower. The last question, of course, is solved by organizing high-quality lighting, but these are additional expenses for such “gluttonous” spotlights. Plus the cost of heating - and these are not closed circuits, but streets. You also need to be prepared for the fact that from time to time outside the city it is during winter bad weather that power outages occur, so you need to provide for diesel or gasoline power generators.

Summer is also unpredictable, but it pleases with a long day. But the prices for the material during this period also increase - for concrete, “loose”, cement, rebar, etc., which is important for us. When cooperating with InnovaStroy, you should not worry about this issue - we use only high-quality raw materials, because our partners are proven suppliers for a long time. But in any case, prices in the usual summer season will be higher.

Yes, in winter the productivity of construction is much lower, especially during frosts, when builders are increasingly removed to change houses to warm themselves, and even at -25 degrees it is not recommended to carry out any construction manipulations. But still, it is better than a simple downtime up to six months.

When is the foundation to be built? The answer is simple - it is optimal in the fall, as well as to decide on the project. In winter, you should definitely get all the important material, establish coordination procedures, construction work can also begin, but they will become the most intensive in spring and summer. But every moment is individually decided with the customer. Everything will depend on the budget allocated for the construction, the client's requests regarding the completion of construction and special architectural preferences.

What and when is it better to build a foundation?

The process of building a foundation is extremely simple if professionals do it. The InnovaStroy team knows what the customer needs, because each of you is connected by several things. Customers strive to get a comfortable, durable, strong house that will stand for a long time and will not create problems in operation. At the same time, the goal is to minimize costs and approach the deadline for the completion of the object. Therefore, we offer cost-effective solutions for choosing the base for the house, focusing on the characteristics of the soil, climatic conditions, the depth of freezing and occurrence of groundwater, the weight and dimensions of the future building.

So, after the experts conduct surveys in the territory allotted for construction, careful calculations are made and a certain type of foundation is selected.

If you have gravel soils of a sandy type and deep freezing in your area, then in this case a shallow-depth one is perfect strip foundation, lying to a depth of no more than 70 cm. This is an excellent base in terms of price and strength, which does not imply the presence of a cellar, a basement. If dusty, fine sands are found, then a foundation of deep penetration to reliable earthen rocks is needed.

For the construction of a serious, strong house on peat and clay soils with high rates heaving specialists offer monolithic foundation. Earthworks for such a foundation are not needed, only the backfilling of a sand cushion of 20-30 cm. Professionals will not offer this option, having found even the slightest slope of the site. In this case, the plate will gradually “slide”, the output will be pile foundation at a price, which is much more attractive than other types of bases.

What time of year to lay the foundation is a difficult question, of course. You can lay the foundation in winter. But is such a rush necessary? additional expenses? To date, there are many special equipment with which you can warm the ground and build a foundation in the winter. But it is worth considering that in the spring there will be a noticeable shrinkage, which differs from the usual for the summer period.

In order not to get completely confused, you should not decide on your own. It is better to turn to InnovaStroy professionals, who, after a thorough analysis of the territory, weighing all the pros and cons, will provide a cost-effective solution regarding the construction of your new home.

When investing money in a new building, a person must imagine how much time it takes to build apartment house, which allows you to control the developer and more competently approach the protection of their rights. The government is on the side of the people in this regard. The existing bills are aimed at protecting buyers from Russia and other countries from unreliable developers. But this does not remove responsibility from the citizens themselves, who must independently assess the risks in the construction of a residential building.

In the current environment, when sanctions and economic problems leave their mark on the construction sector, the buyer of real estate must clearly understand the terms and stages of construction, be able to identify an unreliable construction company and refuse to invest in a timely manner. The problem is that not every person with a certain amount of money on hand has sufficient experience and knowledge necessary to safely invest in real estate under construction. Below are the terms and stages in which multi-storey buildings should be erected, the nuances of the calculation, as well as the probable reasons for the delay in the construction of a residential building.

The average construction time for an object with a large number of floors takes from two to four years. During this period, real estate buyers have to be nervous about the fate of the future apartment and the timeliness of its delivery by the developer. In recent years, situations have increasingly occurred when construction companies, for one reason or another, miss the deadlines for handing over keys.

In order to be able to identify the delay, interest holders must represent the stages of construction of a residential multi-apartment building. Problems at each of the stages can lead to an increase in the delivery time of the object and problems with home buyers.

Main stages

Stages and terms of their implementation:


What's next?

After signing the contract with the developer, the buyer of real estate has the right to control the progress of construction as follows:

  • Personally visit the construction site and observe the processes that take place on it.
  • Follow the information that is transmitted from surveillance cameras and view photos on the site.
  • Check for updates that are made to the project documentation.
  • Contact representatives of the construction company and find out the points of interest.
  • Communicate with other apartment buyers and discuss the reasons for the delay (if any).

How to calculate construction time?

There is an opinion that it is extremely difficult to calculate the construction time of an object due to the large number of construction stages. In fact, there are standards that the developer must follow in the process of building a building. When calculating the construction time, it is necessary to take into account many nuances - the area of ​​\u200b\u200ba residential building, the technology used and the weather. All this affects the working conditions of builders, as well as the speed of work.

But the established standards provide approximate information and act as a guideline. The terms of construction are individual each time and depend on the area where the construction of the object is planned, the correctness of the estimate, the type of foundation used and the configuration of the building itself. It matters if the building has different kinds outbuildings, basement and other elements.

To determine the timing of the construction of an object, it is worth looking at the project declaration and finding out the total area of ​​\u200b\u200bthe structure. Remember that it will not work to set the quadrature “by eye” without the necessary experience. The spread in area also depends on the number of storeys of knowledge and the number of sections, so information from official documents is necessary.

V building codes there is such a thing as a technical break. This implies a suspension of work associated with the season. For example, a pause in winter masonry is possible, waiting for time for the installed piles to freeze, and so on. That is why, for greater accuracy in calculating the timing of the construction of an object, different coefficients are used, taking into account the delays mentioned above. It is worth considering that in each individual region they may vary.

Does the construction time depend on the materials of the house?

One of the main reasons for the delay in the construction of the facility is the untimely delivery necessary materials. Such difficulties usually arise in the implementation individual projects, implying the use in the construction process of special products supplied from abroad. So, when building luxury home a brick from another country may be used, and due to customs delays, it does not reach the site on time.

In practice, almost 40-50% of houses under construction are rented out with a delay of 6-12 months from the deadline that the developer initially sets. Reasons other than materials include:

  • Lack of necessary funds. In the process of developing a business plan, construction companies often do not consider the possibility of force majeure in the economic sector. Initially, the developer is sure that people will dismantle housing, but this does not happen due to a decrease in the solvency of citizens. As a result, fewer apartments are bought, so there is not enough money to build the facility.

You can recognize the difficulties with money from the developer by a number of signs - a decrease in the cost per square meter of housing, the appearance of discounts on real estate, and so on. In this way, the construction company is trying to raise the missing funds to complete the project. Financial problems are also possible with difficulties in obtaining a bank loan.

  • Delays in resolving issues with authorities. In general, local governments are supportive of housing initiatives, but there may be problems later on at various levels. The reasons why the authorities can put "spars in the wheels" are different - high risks for the environment, violation of the boundaries of the building and other factors. In addition, representatives of the construction company have to deal with the dissatisfaction of the residents of houses located in the neighborhood
  • Communication problems. The process of coordinating the supply of water, electricity, sewerage and gas takes a lot of time and requires solving a lot of legal and organizational issues. As a result, construction is delayed indefinitely.

Deadlines for the construction of housing houses

As noted above, equity holders have the right to focus on the maximum construction time for residential multi-storey buildings. The calculation is made taking into account the construction technology, the area of ​​​​the object and the current coefficient. If we are talking about the construction of houses in the Novosibirsk region, the data presented must be multiplied by 1.2.

Buildings and timelines

Consider the deadlines for various types of structures:

  1. Five-story buildings. Depending on the technology, the construction period is as follows (with an area from 1500 to 6000 sq.m.):
  • Large-panel - from 5 to 6.5 years
  • Monolithic - from 6 to 8 years.
  • Brick (from small blocks) - from 6.5 to 9 years.
  1. Nine-story buildings (with an area from 3000 to 12000 sq.m.):
  • Large-panel - from 5 to 8 years
  • Monolithic - from 7.8 to 12 years.
  1. Ten-story buildings (with an area from 3500 to 13000 sq.m.):
  • Large-panel - from 6 to 9 years
  • Monolithic - from 8 to 12 years.
  • Brick (from small blocks) - from 8 to 12.5 years.
  1. Twelve-story buildings (with an area from 4000 to 12000 sq.m.):
  • Large-panel - from 7 to 9.5 years
  • Monolithic - from 9 to 13 years.
  1. Buildings with 14 floors (with an area from 5000 to 12000 sq.m.):
  • Monolithic - from 9 to 13 years.
  • Brick (from small blocks) - from 9.5 to 13.5 years.
  1. Buildings with 16 floors (with an area from 6000 to 18000 sq.m.):
  • Large-panel - from 8 to 9.5 years
  • Monolithic - from 12 to 16 years.
  1. Buildings with 22 floors (with an area from 8000 to 16000 sq.m.):
  • Monolithic - from 14 to 18 years.
  1. Buildings with 25 floors (with an area from 9000 to 18000 sq.m.):
  • Large-panel - from 9.5 to 11 years
  • Monolithic - from 16 to 20 years.

What to consider?

These standards assume that the construction and installation work will be conducted in two shifts, and the main events - in one and a half. Also, the norms take into account the construction of objects, taking into account the installation strip foundation. If piles are installed, the duration increases by ten days for every 100 piles.

Construction time

The time during which a building structure must be built is called the construction time. It consists of periods of time for the implementation of individual construction works. It should be taken into account, however, that different individual works can coincide with each other in terms of time. We are talking about intersections. So, for example, it is already possible to begin to install the formwork of the ceiling above the basement, when only part of the basement walls have been erected. Also, reinforcement can be carried out even before the completion of the formwork. The process over time can be calculated and represented graphically.

Definition of construction time

Construction time depends on the construction work being done. To calculate it, the building structure is divided into construction grips and construction segments. At the same time, the required time and production time are called, and the intersections of the works are also determined. To do this, in the LIST of WORKS, positions are divided into steps for manufacturing or erection and the need for time for these works is determined. It contains data on CONSTRUCTION WORKS (volumes) and COSTS (time spent per unit of volume). This results in the required number of hours of work. According to the number of hours worked per day and the number of workers available, the time of work for the construction of a given structure or for carrying out this work is determined. The construction time is obtained when the individual terms for the construction or production of certain works are added together and the corresponding intersections are subtracted from them.

Given the duration of construction specified in the contract, it can be achieved by extending the daily working hours or by attracting more workers.

Construction Time Representation

If all time segments and intersections are established, then it is possible to present the entire construction time and individual time segments for individual works in the form of a calendar plan. At the same time, the so-called beam plan and the path-time diagram (linear diagram) are distinguished. In the case of large-scale construction tasks, in addition, the network planning technique (network diagrams) can be used. The presentation of the construction time in the calendar plan makes the construction process visual and makes it easier to control the construction time.

BEAM PLAN is used most often. This depiction of the construction process is called a beam plan, because the individual sections of the construction time in the time sequence are represented in the form of beams of a certain length. With such a graphical representation, the time intervals in days or weeks are depicted by horizontal bars, and the segments of the construction of the building along construction work arranged vertically one below the other.

If the time periods of work for one floor are combined, for example, concreting and masonry of the walls of the lower floor and formwork, reinforcement work and concreting of the massive ceiling above the lower floor, then all of them together take the construction time of 14 working days. If separate partial workflows are combined into one beam, then the length of the beam represents the construction time of the lower floor. If all segments of the construction are presented in one beam plan, then the entire construction process can be traced from it.

For a NETWORK PLAN, each individual work segment must be defined and timed with other work segments, for example, using the earliest possible and latest possible start and end of work on the work segment. With the help of the relative position of those construction segments that determine the completion date of construction, a "critical path" can be represented. The compilation of the network schedule is carried out with the help of a computer, and each individual segment can be called up from the general plan, for example, stone work on the second upper floor. The technique of working with a computer allows you to quickly adjust the construction process in case of various unforeseen disturbances, for example, caused by adverse weather conditions.

Terms of construction of the cottage aerated concrete or brick with total area 120-250m 2 on a turnkey basis (from the beginning of foundation work to installation and installation of furniture) averages 8-18 months, depending on the complexity architectural project, design project for interior decoration, engineering equipment for the house, landscape project.

"Box" country house(foundation, walls, ceilings, roof) is being built in terms of 4 to 8 months. If construction is started with the beginning of the April-May construction season, then by autumn (September-October) it is possible to complete the capital construction of the “warm contour” of the cottage with insulation, exterior decoration, installation of windows and exterior doors, and you can proceed to the wiring of internal engineering networks and installation of boiler room equipment. With the onset of cold weather (November-December), the heating system has already been installed, you can pour floor screeds and start heating the house in order to prepare walls, ceilings and floors for interior finishing work.

The most frequently asked questions about the timing of the construction of a country house:

    Is it possible to build a house in parts, i.e. build a foundation in summer-autumn so that it settles, and next spring continue the next steps?

    Answer: according to technological and economic reasons this is not worth doing. Firstly, in order to “overwinter” the foundation, it is necessary to take a whole range of additional measures to protect it from low temperatures, which increases the financial costs of construction. The foundation for the winter must be: 1) insulated over the entire area with extruded polystyrene foam or other insulation to protect the soil from freezing and frost heaving, 2) insulate the earth's surface along the perimeter of the foundation to a width of 1.5-2 m, 3) insulate all non-concrete outlets of reinforcement. Secondly, the foundation will not be able to give the standard settlement without the load on it of the main capital structures: walls, ceilings, roofs, etc. The draft is given only by the completely erected "box" of the house.

    How soon after pouring the foundation can I start laying walls of aerated concrete and brick?

    Answer: it is possible to start laying in 3-4 days during the construction of the foundation in the Moscow and Leningrad regions during the main construction season (April-September) according to the table on the normative and safe concrete setting times, during which concrete care measures are taken.

    When can I start the interior decoration of the house from aerated concrete?

    Answer: all internal finishing works (plastering, painting, plastering, tiling) are recommended to be carried out for the next season after the end capital construction. Immediately after the completion of the construction of the "box" of the house, it is possible to produce the following types works: finishing of the facade (facing bricks, lining on the side), installation of windows and external doors, wiring of all internal engineering networks: water supply pipes, sewerage, radiator heating, "warm water floor" systems, electrical wiring; installation of engineering equipment in the boiler room, assembly of an electrical panel, installation of a concrete floor screed, installation of external engineering networks (local sewerage, drainage system, storm sewerage, drainage system), commissioning work on all engineering systems of the house, installation of blind areas, paths, check-in, areas for cars, construction of fences, construction of auxiliary buildings on the site and small architectural forms, landscape work.

    When can I start exterior finishing of aerated concrete houses?

    Answer: masonry facing brick, installation of any ventilated facades (at a distance), installation of facade plaster on mineral insulation can be carried out immediately after the construction of the “box” of the house is completed without restrictions. For plaster systems, it is necessary to observe the temperature regime.

    Finishing work using coatings applied directly to external walls (plastering, painting), as well as facings adhesively bonded to masonry (clinker and other tiles glued to the wall, natural and artificial stone, etc.) can be carried out after removal from laying the main amount of initial moisture - for the next season after construction is completed.

    How long can an aerated concrete house stand without finishing?

    Answer: an aerated concrete house without exterior finish is recommended to be left for a period of no more than 3 years. During the specified period of destruction of the structure of aerated concrete blocks does not occur.

    When is the best time to start building a house?

    Answer: it is better to start building a house from aerated concrete and brick in the spring (April-May), when all the snow has melted on the site and there is a stable positive temperature above 5 0 C for more than 5 days. To start building the foundation, the soil must thaw. At the same time, it is necessary to take into account the regulations of cottage settlements and the local administration, which can limit or completely close roads for heavy vehicles for the period of drying roads. Because building monolithic foundations is impossible without the work of special equipment on the site and without the delivery of such capacious materials as sand, crushed stone, reinforcement and concrete, then it is better to start construction from the end date of the seasonal restriction on the movement of construction equipment. In order to start building a house in the spring, it is better to decide in advance (in autumn-winter) on the choice of a construction company and purchase basic materials (rebar, brick, aerated concrete, lumber, roofing, etc.) before their seasonal rise in price. Usually the first rise in price of building materials occurs in late March or early April.

    When can you build a house?

    Answer: you can build a house with the help of a professional construction company all year round, incl. during the autumn-winter period. Therefore, if you have cash for the construction of the "box" of the house or foundation, then do not put it off until later. The cost of building a house with an area of ​​​​about 140-220m 2 annually increases by an average of 400,000 - 600,000 rubles!!!

    How long should the foundation stand?

    Answer: the foundation should settle for 3-4 days after pouring at an average ambient temperature of +15- +20 0 C. After this time, you can start dismantling the formwork and start building the load-bearing walls of a country house.

    How long does it take for foundation to dry?

    Answer: the foundation dries for 6-8 hours at an average air temperature of +15- +20 0 C. After a specified time, you can walk on it. In order for the concrete to set and gain its standard strength, it is necessary to moisten it in combination with other concrete care measures within 3-4 days after concreting. And only after that proceed to further construction and installation work.

    Foundation construction time

    Answer: the timing of the construction of the foundation "monolithic slab" with an area of ​​​​150-200m 2 from the beginning of earthworks to concreting (excavation, crushed stone and sand foundation, insulation, waterproofing, reinforcement in 2 rows with a cell of 200 mm, pouring) by a qualified team of monolithic workers consisting of 3 -4 people average 2-3 weeks. For the construction of other types of foundations: buried strip, pile-grillage or ground floor, the construction time depends on the specific conditions of construction and on construction volumes.

The terms of construction of a private house are regulated by the Contract and the Work Schedule. Before starting the construction of a country house, Full House specialists prepare an appendix to the Contract Agreement - Work Schedule, according to which the Contractor undertakes to complete the entire list of construction and installation works on time.

Time is money, and no one argues with that. The sooner the house is built, the less money will be spent both on renting housing for the owners, and on the maintenance of hired workers, and on gasoline in order to travel and check the quality of work. In the age of high speeds, no one is ready to wait for years for the opportunity to move into their housing, and the market offers a large number of options for prefabricated houses. So let's see how long low-rise construction takes these days.

What affects the construction time

For some, it takes three years or even more to build housing, while for others it takes only one season. They say that the construction time of a house depends on its size and whether the owner has all the necessary amount of money, and we agree with this. It is not easy to save, but it is scary to take a loan, especially when there is a threat of dismissal from work, so they are building a house based on the available funds. This construction option is the longest and most costly, because, in addition to directly stopping work, an unfinished house must be preserved, for example, during the winter or rainy season, which requires additional costs. But let's leave these subtleties aside for now and try to figure out how long it takes to build a house, assuming that there are no financial problems.

Video description

An example of the implementation of a 120 m2 frame house project in 3 months, see the video:

It should be borne in mind that this largely depends on the construction technology or building material. For example, the time of building a house from a bar will be less than building from bricks or blocks, but more than when choosing SIP panels for construction. It is technologies and materials that impose their limitations on the time of shrinkage or final drying, on choosing the best time for construction, on the type of foundation and on how much money is needed to build a house. Let's take a look at some of the most popular technologies.

Selected technology

How long does it take to build a house, depending on the construction technology and building materials used:

Construction technology
or building material
Construction time Shrinkage time Shrinkage A type
foundation
Is it possible
build
in winter?
Price
Glued laminated timber 2-3 months No 1-2% light Yes high
double beam 1-2 months 1 month 1-2% light Yes average
profiled
timber
1-2 months 6 months 3,5-10% light Yes below
middle
log handmade
felling
3-4 months 6 months 10-12% light Yes very
high
rounded
log
2-3 weeks 6 months 6-12% light Yes average
SIP panels 1 Week No No lightweight Yes small
frame houses 1-3 months No 1-2% lightweight Yes small
LSTK 24 weeks No No lightweight Yes average
Modular houses 2-4 days No No lightweight Yes average
Arbolit 2-3 months No No lightweight No average
Reinforced concrete
blocks
1 Week No No heavy Yes average
Brick 4-5 months 3-10 days No heavy No high
Aerated concrete blocks 2-3 months No No heavy No average

Foundation

Explanations about the types of foundation:

  • light- shallow-depth tape (a concrete strip buried thirty centimeters into the ground, passing along the perimeter of the building and under its load-bearing walls);
  • lightweight- columnar, pile (made in the form of pillars or piles hammered into the ground, united from above by an iron or concrete frame) or shallow tape;
  • heavy- a heavily buried foundation (a foundation laid at a depth below the freezing level of the soil in winter).

Original chalet building

Note that if, for example, a brick house needs a heavy foundation, and a frame house needs a lightweight one, this does not mean that the owner does not have the right to choose for frame structure light or even heavy foundation - it all depends on his desire. But when arranging a heavy foundation, it should be remembered that it gains 100% strength only on the 28th day, and this at a temperature of about 200 ° C and a relative humidity of 90–100%.

Separate elements of the house

It takes about a month to build a roof, another month to install windows and conduct communications, and 4–5 months to finish inside and outside the house. General terms work can be reduced if you do several things at the same time, for example, build a roof and carry out communications. Some wall construction technologies, such as round logs or glued beams, do not require either interior or exterior finishing, and this also saves time.

House with original facade

What else can affect the construction time of a house

However, it should be borne in mind that the table indicates how much a house can be built with ideal conditions, but after all, life can make its own adjustments in the construction process of the building, and the most common ones are:

  1. Delaying the approval of projects for the building, gas, electricity.
  2. Delay in the supply of building materials - this happens especially often at the height of the construction season; an increase in the price of building materials - this can increase costs and, if the budget was drawn up back to back, completely stop the construction process.
  3. Insufficient efficiency of the work of the performers - then the end of one process may overlap with the beginning of the next: for example, one team has not yet completed the walls, and the other has already arrived to install the roof.
  4. Late delivery of special equipment, such as an excavator or truck crane.

How to speed up the construction process

And finally, I would like to say that can be done to speed up the construction process:

  • to think over and calculate the schedule and budget of work in advance;
  • approve all necessary communications projects;
  • use a standard project - a house is being built faster according to a well-established scheme;
  • choose technologies that do not require long-term shrinkage;
  • enter into an agreement with a well-established construction company in the market.

Video description

Another educational video:

Conclusion

Of course, construction is a complex process, and it is almost impossible to foresee everything, however, if you thoroughly prepare for the construction of a country house, then the house can be built in the shortest possible time.